Integra Manufacturing Suite · Product Engineering
Bill of Materials
Multi-level BOMs with versions and alternates.
Available from the Starter plan
What it includes
- Multi-level BOMs
- BOM versions
- Alternate materials
- By-products and scrap
- BOM cost roll-up
More in Product Engineering
- Routings & Work CentresOperations, machines and standard times for every product.From Growth
- Drawings & SpecificationsDrawings, specifications and work instructions with revisions.From Growth
- Engineering ChangesChanges to products and BOMs, approved and traced.From Premium
Get started
Let's connect your shop floor
Tell us how your plant works and we will show you the Manufacturing Suite running your orders, production and quality.
- 01
Discover
We map your products, processes and work centres.
- 02
Configure
BOMs, routings, inspection plans and roles are set up.
- 03
Connect
Scanners, scales and machines are linked.
- 04
Migrate
BOMs, open orders and WIP are loaded.
- 05
Train
Planners, supervisors, quality and operators get started.
- 06
Grow
Add lines, plants and Machine Connect any time.