Skip to main content
Integra

Integra Manufacturing Suite · Quality

Incoming Inspection

Materials checked before they reach the store.

Available from the Growth plan

What it includes

  • Inspection plans by item
  • Sampling
  • Accept, reject or deviation
  • Inspection reports

Get started

Let's connect your shop floor

Tell us how your plant works and we will show you the Manufacturing Suite running your orders, production and quality.

  1. 01

    Discover

    We map your products, processes and work centres.

  2. 02

    Configure

    BOMs, routings, inspection plans and roles are set up.

  3. 03

    Connect

    Scanners, scales and machines are linked.

  4. 04

    Migrate

    BOMs, open orders and WIP are loaded.

  5. 05

    Train

    Planners, supervisors, quality and operators get started.

  6. 06

    Grow

    Add lines, plants and Machine Connect any time.